PM: Controlling Document Changes
You'll be introduced to best practices for controlling changes to a project document.
Created Date
10.21.15
Last Updated
10.21.15
Viewed 78 Times
Create multiple-choice games on Wisc-Online and play them on our Chakalaka mobile app!
But that's not all! Explore educational games created by others. Simply search by category or enter agame code number and dive into a world of learning and fun.
Download the Chakalaka mobile app here:
Topics of this game:
-
While many project documents are created through a project, only management needs to know how to control them.
-
Not every project revision is important enough to be documented. Minor ones should be left out so the original document doesn't become cluttered.
-
Changes to project documents can result from changes initiated by ___________.
-
Project changes impact the project's scope, cost, and schedule.
-
It's only important for the project manager to know which version of a document is the latest version.
-
Which of these is an effective change control process to include on each document page?
-
If John Smith makes changes, a notation in the lower corner of the document should read: 7/5/2016